RED BOLD – JVB Projects.
BLACK BOLD – Projects completed while
associated with another firm.
INDUSTRIAL
5
Rubber Corporation, American Headquarters, Griffin, Georgia.
190,000-SF build-to-suit manufacturing.
Airborne Express, Pinellas County, Florida. 5,000 SF of private
offices, and 51,000 SF warehouse.
Allikriste, St. Petersburg, Florida.
5,000-SF warehouse tenant improvement.
Allikriste, St. Petersburg, Florida.
22,000-SF warehouse tenant improvement.
Amana Refrigeration, Tampa, Florida. 8,000-SF office and a
107,000-SF Distribution Center.
Anixter, St. Petersburg, Florida.
45,000-SF warehouse tenant improvement.
Atlas Moving, Pinellas County, Florida. 25,000 SF tenant at Gateway
Business Centre.
Blackburn Bridge Tender's Facility, Sarasota, Florida. Florida
Department of Transportation. 2,500-SF bridge tender’s facility.
BT Office Products, Tampa, Florida. 76,500-SF regional distribution
1996 NAIOPOutstanding Distribution Award.
Gateway Business Centre - Building Two, Pinellas Park, Florida.
93,780-SF speculative rear load warehouse.
Gateway Business Park, Building "B", St. Petersburg, Florida.
129,800-SF, speculative rear load warehouse.
Gateway Business Park, Building "C", St. Petersburg, Florida.
129,800-SF, speculative rear load warehouse.
Gateway Business Park, Building "D", St. Petersburg, Florida.
188,000-SF, speculative rear load warehouse.
Gran Park - Frontload One, Jacksonville, Florida. 98,800-SF
tilt-up, front-load dock-high warehouse.
Gran Park - Rail One, Jacksonville, Florida. 104,300-SF tilt-up,
front-load, dock-high, rail service warehouse.
Gran Park - Mater Plan at Jacksonville, Jacksonville, Florida.
375,000-SF rail service and front load design.
Gran Park Front Load #4, Medley, Florida. 92,000-SF tilt-up,
front-load dock high distribution center.
Gran Park Front Load #5, Medley, Florida. 119,400-SF tilt-up,
front-load dock high distribution center.
Gran Park McCahill Frontload #1, Medley, Florida. 140,000-SF
tilt-up, front-load dock-high speculative distribution center.
Gran Park Rail Building #4, Medley, Florida. 138,600-SF tilt-up,
front-load dock-high, rear rail service.
Gran Park Service Center O.S. #1, Medley, Florida. 42,000-SF
tilt-up service center.
Gran Park Service Center O.S. #5, Medley, Florida. 106,560-SF
tilt-up service center with rear load dock doors.
Gran Park Service Center O.W. #1, Miami, Florida. 103,000-SF
tilt-up service center.
Heidelberg USA, Atlanta, Georgia. 70,000-SF distribution warehouse
with a 50,000-SF corporate office.
Hellmann Freight Forwarders, Miami, Florida. 149,000 SF
distribution warehouse and corporate headquarters 1998 Precast/Prestressed
Concrete Institute Award, Special Recognition.
Home Depot Lumber Distribution Center, Pompano Beach, Florida.
94,000-SF warehouse and offices.
Hunter Douglas Fabrication, Pinellas Park, Florida. 85,000-SF
build-to-suit manufacturer facility.
ISS Landscape Services, Tampa, Florida. 9,000-SF office/service
facility. Masonry construction.
Joe’s Creek Industrial Park, Pinellas Park,
Florida. Multiple renovation projects.
Lockheed Martin Center of Excellence for Metal Forming and Fabrication,
Pinellas Park, Florida. 200,000-SF manufacturing facility for aluminum
aircraft components.
Madison Industrial Building “A”, Tampa, Florida.
38,000-SF warehouse near the Port of Tampa.
Madison Industrial Building “B”, Tampa, Florida.
38,000-SF warehouse near the Port of Tampa.
Madison Industrial Building “C”, Tampa, Florida.
34,200-SF warehouse near the Port of Tampa.
Madison Industrial Building “D”, Tampa, Florida.
28,500-SF warehouse near the Port of Tampa.
Madison Industrial Building “E”, Tampa, Florida.
34,200-SF warehouse near the Port of Tampa.
Mygrant Glass, Tampa, Florida. 15,800-SF storage warehouse
including 2,000-SF of office.
RollTech Doors, St. Petersburg, Florida. 12,000-SF tenant
improvement for a rolling shutter/door manufacturer.
Roof Retrofit, Tampa, Florida. Numerous roof retrofit projects
ranging from 5,000-SF to 35,000-SF.
Rooms to Go Distribution Center, Tampa, Florida. 490,000-SF
build-to-suit tilt-up distribution center.
Star Distribution, Plant City, Florida. 508,000-SF distribution
center.
Tampa West Industrial Center, Buildings #4 and #5, Tampa, Florida.
43,000 SF rear-load warehouse.
INSTITUTIONAL
Dickenson Elementary School, Tampa, Florida. School Board of
Hillsborough County. 52,000-SF Renovations and additions (40,000-SF
renovations and 12,000 SF new construction).
Phosphate Education and Research Learning Center, Bartow, Florida.
The center is located on FIPR’s eight-acre campus, which was reclaimed
from a phosphate mining site, and will provide essential K-12 education
and outreach programs intended to bring the “phosphate story” into the
context of the educational curriculum.
Howard Avenue and Morrison Avenue Parking (SoHo District), Tampa,
Florida. The parking area is located beneath the Expressway within
walking distance of the growing South Howard (SoHo district).
Turkey Lake Regional Toll Facility, Orange County, Florida. Florida
Department of Transportation. Additions and renovations (75,000-SF;
65,000-SF renovation and 10,000-SF new construction).
INTERIOR
DESIGN/TENANT IMPROVEMENT
514 Franklin Street, Tampa, Florida.
20,000-SF renovation for a 1950’s art-deco style mixed-use building in the
central business district. Includes interior design for common space
areas.
Baxter/Enviromed International Health Services, Tampa, Florida.
3,500 SF office renovation.
Baldwin, John, Tampa, Florida.
1,200-SF office / tenant improvement for The Perry Company.
Bank Atlantic Training, Tampa, Florida.
6,000-SF teller training facility for the regional bank operations.
Bill Miller, Tampa, Florida. 1,200-SF
office / tenant improvement for The Perry Company.
Brigham & Moore LLP Attorney Office, St. Petersburg, Florida. 5,000-SF
attorneys office.
Cat Cay Yachts, Tampa, Florida.
1,625-SF office / tenant improvements for The Perry Company.
Celebration Boulevard 1180, Celebration Florida. Full architectural
and interior design services for an 80,000 SF, 2-story speculative office
building designed in conjunction with Graham Gund Architects. The project
is designed in the Celebration Modern style with a custom terrazzo floor
continuing the Art Deco influence.
Celebration Boulevard 1170, Celebration Florida. Sister building of
1180 Celebration Boulevard.
Compass Group, St. Petersburg, Florida. 25,000 SF food vending
distributor tenant at Gateway Business Park.
Dr. Peterson Offices, Clearwater, Florida. 5,800-SF doctor clinic
for an Orthopedic Surgeon.
Electric Technology Resource Center, Tampa, Florida. 10,700-SF
facility, comprising of “state-of-the-art” lighting and technology labs.
ENSR, St. Petersburg, Florida.
4,300-SFoffice tenant improvement.
Essilor of America, St. Petersburg, Florida. 90,000 SF for an
international lens manufacturer and distributor. The tenant fit-out is
located at Gateway Business Park.
GTE Wireless, Tampa, Florida. 160,000-SF 3-story, “Fast-Track”
custom designed call center for the processing and tracking of mobile
telephone operations; built for regional consolidation of staff.
Hussmann Corporation, Tampa, Florida. 15,000-SF tenant fit-out.
Info USA, Tampa, Florida. 22,000-SF
tenant improvement at Pembrooke Pines Office Park.
KHS&S, Tampa, Florida. 7,000-SF
concept space plan for a vacant office building. The owner required
concept plans for leasing budgeting and preliminary representation of
space utilization.
John Casablanca, Tampa, Florida. 15,000-SF office / studio for a
modeling agency.
L3 Communications, Florida. 130,000-SF tenant improvement for a
manufacturer of security equipment.
Ligori Office Building, Tampa, Florida.
6,500-SF Build-To-Suit, 2-Story masonry office building for a local
attorney.
Medical Corporate Training Group, Clearwater, Florida. 2,500-SF
training clinic for surgeons.
Moran Foods, Lakeland, Florida. 127,200-SF storage warehouse
including 5,000-SF of office.
MTS – Medical Technologies, St. Petersburg, Florida. 100,000 SF
tenant improvement for medical supplier / manufacturer. Located in Gateway
Business Park, Building B.
Netoy.com, St. Petersburg, Florida. 59,000 SF tenant at Gateway
Business Park. The tenant is an “e-commerce” company marketing and selling
toys via the Internet.
New Advantage Corporation, St. Petersburg,
Florida. 50,000-SF Corporate office interior design.
OmniCare Pharmaceutical, St. Peterburg, Florida. 40,000 SF office
and laboratory for a local pharmaceutical company. The company provided
mail order prescription filling and IV supplies.
Paychex Branch Office, St. Petersburg, Florida. Grady Pridgen, Inc.
18,000-SF tenant improvement for a local payroll-outsourcing provider.
Paychex Regional Managers Office, St. Petersburg, Florida. Grady
Pridgen, Inc. 1,200-SF tenant improvement for a local payroll-outsourcing
provider.
Scott McPherson Esq., New Port Richy, Florida.
A 2,000-SF attorney office with minor modifications. Plans were submitted
for permit with no interior design.
MASTER PLANNING
A.G.E. Lifestyle Center, Germany. 320 Acre master planning for a R&D,
Office and Industrial. *
Gateway Business Centre - Master Plan, Pinellas Park, Florida.
Schematic master plan for a 31-acre light industrial development at
Gateway Centre. The master plan includes Lockheed Martin Metal Fabrication
Center of Excellence, Hunter Douglas and a spec flex building totaling
over 378,780-SF.
Gateway Business Park - Mater Plan (Gandy), St. Petersburg, Florida.
Master plan for a 42 acre light industrial development at Gateway Centre
totaling over 500,000 SF and consisting of four buildings.
Gran Park at Miami, Miami, Florida. Master planning for 125 acres
of mixed use industrial park. Design incorporated Rear Load, Front Load,
Double Load and Rail Service buildings.
Hampton Oaks - Mater Plan, Tampa, Florida. Master planning for a
16-acre office/industrial development for three office/service building in
an existing 24-acre office/industrial park.
Reynolds Industrial Park - Mater Plan, Green Springs, Florida.
Master planning for a 1,500-acre intermodal transportation complex located
on a decommissioned naval air station.
MEDICAL
Dr. Peterson Offices, Clearwater, Florida. 5,800-SF doctor clinic for
an Orthopedic Surgeon.
Medical Office Building, Clearwater, Florida. 20,000-SF shell
office building to house two doctor clinics, a physical therapy suite, a
MRI suite, and medical offices.
Medical Corporate Training Group, Clearwater, Florida. 2,500-SF
training clinic for surgeons.
MTS – Medical Technologies, St. Petersburg, Florida. 100,000 SF
tenant improvement for medical supplier / manufacturer. Located in Gateway
Business Park, Building B.
MIXED USE
Alessi Properties, Tampa, Florida.
3.6-Acres of undeveloped land. Land-use change and Re-zoning. 2 city
blocks consisting of 32 lots with ½ - Acre wetland.
Millstone Building, St. Petersburg, Florida. Mixed-Use, 2-Story
12,000-SF masonry & steel structure. 6,000-SF retail and enclosed dumpster
area with trash shute with 3 residential condominium units at 1,800-SF
each.
SouthTown Center Retail, Tampa, Florida. Capstone Group, Inc.
40,000 SF high-end retail center located in South Tampa. The project
includes 20,000 SF of renovation and 20,000 SF of new construction.
University of Florida Bookstore and Visitor Welcome Center,
Gainesville, Florida. A $15 million project which consists of a 40,000
SF University Bookstore, a 15,000 SF Visitor Welcome Center, a 150,000 SF
parking garage, a 10,000 SF service area/dock and a 6,000 SF food court
bridge.
OFFICE
514 Franklin Street, Tampa, Florida.
20,000-SF renovation for a 1950’s art-deco style mixed-use building in the
central business district. Includes interior design for common space
areas.
Bright House Networks, St. Petersburg, Florida. 160,000-SF new
facility is located in the Carillon Office Park in St. Petersburg,
Florida. The building is a 3-story tilt-up concrete panel structure with
brick inlay in the panels and a brick veneer at the main entrances. The
building also has a 3 level parking garage connected via pedestrian
bridges from 2 separate levels.
Celebration 220, Celebration Park, Celebration, Florida. 200,000 SF
build-to-suit Disney Corporate Headquarters building originally designed
by Also Rossi.
Celebration Boulevard 1180, Celebration Florida. 80,000 SF, 2-story
speculative office building designed in conjunction with Graham Gund
Architects.
Celebration Boulevard 1170, Celebration Florida. 80,000 SF, 2-story
speculative office building designed in conjunction with Graham Gund
Architects; sister building of One Celebration Boulevard.
Digital Lightwave Corporate Headquarters, Largo, Florida. 3-story,
90,000-SF Corporate Headquarters and parking structure.
Digital Lightwave Corporate Headquarters Expansion, Largo, Florida.
25,000 SF interior expansion.
Digital Lightwave Corporate Headquarters Re-Configure / Renovation,
Largo, Florida. 15,500 SF of interior renovations in the existing
3-story, 90,000-SF Corporate Headquarters.
Disney Reservation Center, Tampa, Florida. 64,000-SF reservations
center.
First Union National Bank of Florida Operations Center, Miami, Florida.
100,000 SF remodel to relocate a regional money center office.
Florida Power Addition (Phase 2), Lake Mary, Florida. 2-story,
40,000 SF speculative office building.
Florida Power Customer Service Center, Lake Mary, Florida.
45,000-SF Call Center.
GTE Wireless, Tampa, Florida. 160,000-SF 3-story, call center for
the processing and tracking of mobile telephone operations.
Gateway Business Park, Building "A", St. Petersburg, Florida. 3
different schemes of a speculative office building on a 5.4 acre site,
part of a 42 acre master plan. The designs ranged from a 60,000 SF, 2
story building to a 151,000 SF, 6 story building.
Hampton Oaks Building 4, Tampa, Florida. 28,740-SF speculative
office service center.
Hampton Oaks Building 5, Tampa, Florida. 67,715-SF speculative
office service center.
Hampton Oaks Building 6, Tampa, Florida. 72,000-SF speculative
office service center.
Italian Club (Lunione Italiana), Ybor City, Tampa, Florida. Italian
Club liaison / Project Manager of a $1.5 Million renovation to the
historic structure. The building was constructed in 1918 and is listed in
The National Registry of Historic Sites.
Lake Mary Office Building, Lake Mary, Florida. 40,000-SF, two-story
speculative office building.
Ligori Office Building, Tampa, Florida.
6,500-SF Build-To-Suit, 2-Story masonry office building for a local
attorney. The building is a Mediterranean design for muti-tenant use.
Services include the space planning and building design.
Medical Office Building, Clearwater, Florida. 20,000-SF shell
office building to house two doctor clinics, a physical therapy suite, a
MRI suite, and medical offices.
MTS – Medical Technologies, St. Petersburg, Florida. 100,000 SF
tenant improvement for medical supplier / manufacturer. Located in Gateway
Business Park, Building B.
New Advantage Corporation, St. Petersburg,
Florida. 50,000-SF Corporate office and 30,000-SF warehouse.
Owens & Minor, Sunrise, Florida. 147,000-SF Build-to-Suit
pharmaceutical distribution center. Tilt-Up Construction.
Pall Aeropower, Pasco County, Florida.
14,000-SF corporate office for an international aerospace corporation.
Paragon Cable, Tampa, Florida. Provided exterior facade design for
new corporate facility at Regency Park.
Planet Hollywood Warehouse/Distribution Facility, Orlando, Florida.
85,000-SF memorabilia storage and distribution warehouse facility, part of
a 13.9 acre masterplanned campus.
Planet Hollywood, Orlando, Florida. 12,000-SF regional office
including a 75,000-SF “prop” storage warehouse.
PricewaterhouseCoopers Professional Development Center, Tampa, Florida.
135,000-SF of office space and a parking deck for 500 cars. Tilt-up
Concrete Association 2000 Tilt-up Achievement Award.
Tampa Bay Presbyterian Church, Tampa, Florida. Design/build
Architectural services for a 2,800-SF addition consisting of classrooms
tying into existing church.
Traffic Controls, Tampa, Florida.
13,000-SF expansion to an existing 12,500-SF masonry office warehouse.
Trigon USA Manufacturing Regional Offices, Peachtree City, Georgia.
51,280 SF tilt-up, build-to-suit plastic extrusion manufacturing facility
including 8,000 SF of Regional Offices. Tilt-Up Construction.
University of Florida Bookstore and Visitor Welcome Center,
Gainesville, Florida. A $15 million project which consists of a 40,000
SF University Bookstore, a 15,000 SF Visitor Welcome Center, a 150,000 SF
parking garage, a 10,000 SF service area/dock and a 6,000 SF food court
bridge.
University Tech Center II, Tampa, Florida. 40,000-SF Research and
Development facility at the University Technology and Research Park at the
University of South Florida.
RESTAURANT
Alessi Woodstone Oven, Tampa, Florida.
4,200-SF, 120-seat Italian style restaurant.
Old Meeting House “Eats”, Tampa, Florida.
Renovation of a landmark structure for a small eatery.
Rigatoni Restaurant, Tampa, Florida.
1,300-SF existing retail building converted into a 47-seat Italian style
restaurant.
VSpicery, Tampa, Florida. 800-SF
retail tenant improvement for a spice retailer and cooking showroom.
RETAIL
Buds Blooms and Beyond – Tampa, Florida.
3,000-SF retail interior improvements and minor exterior renovation for a
local florist.
Floor & Décor – Tampa, Florida. 30,000-SF retail interior
improvements and minor exterior renovation.
SouthTown Center Retail, Tampa, Florida. 40,000 SF high-end
retail center located in South Tampa. The project includes 20,000 SF of
renovation and 20,000 SF of new construction.
Tampa Palms Retail, Tampa, Florida.
2,500-SF retail “white box” improvements to existing retail shell
building.
Thomason Village Retail, Naples, Florida.
14,500-SF retail building. Designed in compliance with Collier County Land
Development Code.
University Collection Retail, Jacksonville, Florida. Facade
renovation to existing 80,000-SF retail strip center.
University of Florida Bookstore and Visitor Welcome Center,
Gainesville, Florida. 40,000 SF University Bookstore.
VSpicery, Tampa, Florida. 800-SF retail tenant improvement for a
spice retailer and cooking showroom.
RESIDENTIAL
PROJECTS (Multi-family and Single-family)
130 Beach Drive, St Petersburg, Florida. 7-Story Mixed-Use Condo and
Retail building.
68th Ave Residence, St Petersburg, Florida. 4-Story 6,000-SF
residence.
Alessi Properties, Tampa, Florida.
3.6-Acres of undeveloped land.
Alessi Properties, Tampa, Florida. 1,350-SF single-family speculative
home.
Anthony Development Group, LLC. 4-Unit
3-story Townhouse designed in the Mediterranean style. 2,300-SF 3 bedroom,
2.5 bath, 2 car garage with bonus room.
Bernstein Residence, Town of Surfside, Florida.
Renovation and addition to an existing 1,400-SF residence in South
Florida. Addition includes a 2-story structure with a large master suite.
New residence will have 4 bedrooms, and 3 bathrooms.
Brewmer Residence, Professor & Dr. Brewmer.
Tampa, Florida. 75-year old, 4,500-SF Mediterranean Style
residence. Multiple projects design and construction include: 2-car
carport; renovation of existing garage into pool cabana and storage,
layout of tropical pool landscaping and kidney shapped pool with jacuzi;
100-SF 3rd floor tower.
Ensinosa Residence. Tampa, Florida.
1,600-SF, 3-bedroom 2-bath residence with 2-car garage.
Jean Street Residence, Tampa, Florida.
1,500-SF, 3-bedroom 2-bath residence.
Millstone Building, St. Petersburg, Florida. Mixed-Use, 2-Story 3
1,800-SF residential condominium units.
Morrison Residence, Tampa, Florida.
2-story 9,450-SF residence for Jim & Barbara Morrison.
Phi Delta Theta Fraternity House, University of South Florida, Tampa,
Florida. Phi Delta Theta.
Residential Mid-Rise Condos, St. Petersburg,
Florida. Conceptual and Schematic studies for a 20 unit,
15-story structure on a narrow site in Downtown St. Petersburg.
Sandpiper Apartments, St. Petersburg, Florida.
AIMCO. Miscellaneous projects including stair replacement, monument
signage, for a 40 Building 120 Unit apartment complex.
Sunrunner Apartments, St. Petersburg, Florida. AIMCO. Miscellaneous
projects including stair replacement, monument signage, for a 280 Building
70 Unit apartment complex.
StillWater Model 3, Tampa, Florida.
2-Story, 8,000-SF Model residence for the Fechtel Company.
|